Skip to content

Solar PV system planning

Clarify roof duties, grid and register steps, subsidy context, and provider contact before you request an installation quote.

Updated: May 21, 2026 · Automatically generated


PV planning selector

Use this as a planning selector for PV, grid registration, storage, charging context, and provider path. It is not a cost calculator.

Your situation Next step
You plan rooftop PV Check duties
You want solar charging Open wallbox path
You need installation contact Open providers

Core duties

For rooftop PV, the practical path usually separates grid registration, federal register entry, metering, and tax handling.

Step What to clarify
Grid operator Register every system before grid connection.
MaStR Enter the system in the Marktstammdatenregister.
Smart meter Relevant for many systems from 2 to 100 kWp.
Tax Annual tax handling can become relevant above 30 kWp.

Solar duties differ by state

New buildings, roof renovations, commercial buildings, and residential buildings can follow different state rules. Check the state rule before treating a quote as complete.

Registration path

A rooftop PV system normally needs grid-operator registration and a Marktstammdatenregister entry. Larger systems can add smart-meter and tax steps.

Subsidy context

State and municipal programs change frequently. Separate federal feed-in rules, state support, storage funding, and local utility programs before comparing offers.

Providers by city

Choose a city to compare providers for this topic. The listing stays scoped to the current topic.

Compare providers →