AmtsGuide

Solar PV system

Updated:

  • EEG 2023 – Erneuerbare-Energien-Gesetz: regulates feed-in tariff and funding
  • EnWG amendment (Solarspitzengesetz) – in force since 25.02.2025: regulates smart meter obligation and grid control
  • GModG (Gebäudemodernisierungsgesetz), § 106 – adopted by Bundestag and Bundesrat 2026: introduces, for the first time, a nationwide, staggered solar obligation (see section 9)

2. Statutory duties (order)

StepRequirementThreshold
1Register with the grid operator (feed-in contract)all systems
2Enter in the Marktstammdatenregister (MaStR)all systems
3Install smart meterfrom 2 kWp (60 % rule), since 25.02.2025
3aAdditionally install control box (remote controllability)from 7 kWp to 100 kWp, since 25.02.2025
4Tax office – annual returnfrom >30 kWp

Planning permission: generally not required for rooftop systems. Exceptions: listed-building protection, ground-mounted systems (always subject to approval).

Trade registration: for private individuals not required (counts as a private investment).

Insurance: Extension of the buildings insurance is required (~50–150 €/year extra).

Grid connection: Processing time 4–8 W weeks. From 30 kWp: grid compatibility assessment.

Smart meter and control box requirement (Solarspitzengesetz)

Since 25.02.2025, a two-stage regulation has applied:

  • 2 up to under 7 kWp: The 60% feed-in limit applies. A smart meter is provided for; a control box (remote controllability by the grid operator) is not strictly required.
  • 7 to 100 kWp: In addition to the smart meter, a control box is mandatory, so that the grid operator can regulate the system if needed.
  • Without a control box (if required from 7 kWp): feed-in is permanently throttled to 60 % of nominal output → up to 30 % loss of revenue.
  • Over 100 kWp: unchanged remote control requirement as before, plus a data logger requirement for continuous monitoring.
  • Grandfathering: Systems that were commissioned before 25.02.2025 are initially fully exempt (no 60% limitation, no retroactive obligations). Existing systems over 7 kWp must, however, be retrofitted by no later than the end of 2028.

3. grid operators

Germany has around 850 regional grid operators - the responsible grid operator depends solely on the postcode, not on the electricity supplier.

Most important regional grid operators

Grid operatorMain region
BayernwerkBavaria (except cities with their own Stadtwerk)
WestnetzNRW, Rhineland, parts of western Germany
EnBW NetzeBaden-Württemberg
Stromnetz HamburgHamburg
E.DISBrandenburg, Mecklenburg-Vorpommern
Mitteldeutsche Netzgesellschaft (MITNETZ)Saxony, Saxony-Anhalt, Thuringia
Stadtwerke (local)All major cities (Munich, Berlin, Frankfurt etc.)
Find your own grid operator: Postcode search at solar.red/netzbetreiber or ask the installer directly - they usually handle the registration as well.

Grid operator registration process

  1. Submit application - ideally 4–8 W weeks before the planned installation
  2. Statutory deadline: For systems up to 30 kWp, the grid operator must respond within 4 W weeks (§ 8 A para. 5 EEG); for systems over 30 kWp, 8 W weeks apply
  3. Automatic approval: If the grid operator does not respond within the deadline (for systems up to 30 kWp: 1 month), the system is deemed approved (deemed approval) - provided the application is complete
  4. Since January 2025: All grid operators are required to provide TAB and application forms online
  5. From 30 kWp: Grid compatibility assessment required - allow up to 16 W weeks

4. Taxes & VAT

  • 0 % VAT on purchase and installation of PV systems up to 30 kWp on residential buildings (since 01.01.2023) - continues to apply unchanged in 2026, legally without a time limit (§ 12 A para. 3 UStG)
  • In addition to the modules, inverters, battery storage systems as well as planning, delivery and installation are also eligible
  • From >30 kWp: annual return to the Finanzamt required
  • Small business scheme: applicable to feed-in tariff

5. Costs

Price per kWp (as at Q2 2026)

System sizeTypical useCost/kWpTotal costs (without storage)
3–5 kWpSmall detached house / flat1.200–1.600 €5.400–8.000 €
5–10 kWpDetached house 100–180 m²1.200–1.450 €7.500–13.500 €
10–15 kWpDetached house 150–250 m² + heat pump1.200–1.350 €13.500–20.000 €
15–20 kWpLarge detached house / business1.000–1.350 €16.500–27.000 €

Finanztip guideline value: max. 1.600 €/kWp (without storage) - systems are cheaper than 2025 (−4 % on average), but prices have been rising slightly again since April 2026

Cost breakdown (typical for 8–12 kWp)

ComponentCost/kWpShareNote
Solar modules187–300 €20–25 %From April 2026 +10–15 % more expensive (end of Chinese VAT export incentives as at 1.4.2026, plus higher silver prices)
Inverter300–500 €25–30 %~2.850 € for 8 kWp; hybrid models more expensive
Substructure + installation350–600 €35–40 %Slate/Biberschwanz more expensive than sheet-metal roofing
Installation, electrics, planning300–500 €20–25 %Incl. registration, scaffolding, commissioning

With electricity storage

System sizeCosts with storage
5 kWp + 10 kWh storagefrom 14.000 €
8–10 kWp + 10 kWh storagefrom 18.000 €
10–15 kWp + 15 kWh storagefrom 25.000 €

Storage: 700–900 €/kWh (market price Q2 2026); Finanztip recommends max. 600 €/kWh as a guideline

Operating costs

  • Maintenance, inspection, insurance: 1,5–2 % of the investment sum/year (approx. 130–400 €)
  • Service life of modules: 25–30 Jahre
  • Inverter replacement: approx. after 10–15 Jahren (~1.500–3.000 €)

6. EEG feed-in tariff (Q2 2026)

Valid: 01.02.2026 – 31.07.2026 - from 01.08.2026 regular degression by approx. 1 % (every six months in accordance with § 49 EEG 2023; the Bundesnetzagentur officially announces the new rates shortly before the cut-off date in each case)

System sizePartial feed-in (with self-consumption)Full feed-in (without self-consumption)
up to 10 kWp7,78 ct/kWh12,34 ct/kWh
10–40 kWp6,73 ct/kWh10,35 ct/kWh
40–100 kWp5,50 ct/kWh10,35 ct/kWh
Calculation for mixed systems (e.g. 15 kWp): First 10 kWp at 7,78 ct, remainder at 6,73 ct → average ~7,43 ct/kWh (partial feed-in)

Support period: 20 Jahre from commissioning | Source: Bundesnetzagentur


7. Wrofitable

Without storageWith storage
Payback9–12 Jahre12–16 Jahre
Years of yield thereafter15–20 Jahre13–18 Jahre

Recommended system size for a detached house: 8–10 kWp


8. Funding (federal level)

ProgrammeTypeWhat for
EEG feed-in tariffRemuneration per kWhFeed-in to the grid (up to 100 kWp) - see table above
KfW 270 (Erneuerbare Energien – Standard)low-interest loan, no repayment grantPV system and/or electricity storage, up to 100 % of the investment costs, interest rate currently approx. 3,5–11 % effective annual interest depending on credit rating
0 % VATTax exemptionPurchase/installation of PV system, inverter and battery storage up to 30 kWp (see section 4)
Important regarding electricity storage systems: There is 2026 no standalone federal grant specifically for battery-only storage systems (not via BAFA either). Storage systems are only subsidised indirectly via 0 % VAT and via the KfW-270 loan. Regionally, however, some municipalities and federal states offer their own storage grants.

9. Solar obligation by federal state

At present there is still no nationwide, comprehensive solar obligation - the rules have so far been set at state level. That will change from 2027: With § 106 of the Gebäudemodernisierungsgesetz (GModG), which has passed 2026 Bundestag and Bundesrat, there will be a nationwide, staggered solar obligation: from 1.1.2027 for new non-residential buildings with >250 m² usable floor area, from 1.1.2028 for larger existing buildings when the roof is fundamentally renovated, from 1.1.2030 for new residential buildings and adjacent carports. Until then, the following state-law rules apply. Threshold values are mostly area-based (% of suitable roof area), rarely in fixed kWp. Rule of thumb: 1 kWp ≈ 5–7 m² module area; 50 % of a 100 m² roof ≈ 7–10 kWp.
Federal stateObligationIn force sinceApplies toMinimum outputLegal basis
Baden-WürttembergYes01.05.2022 (new builds) / 01.01.2023 (renovations)New builds + roof renovations (>50 % roof covering renewed)≥60 % of the suitable roof areaLBO BW
BavariaPartly - a genuine obligation only for commercial/non-residential buildings; for residential buildings only a non-binding should provision (no fine)01.07.2023 (commercial, genuine obligation) / 01.01.2025 (residential buildings, should provision)New builds from 50 m² + complete roof renewal≥1/3 of the suitable roof area (should for residential buildings)BayBO Art. 44a
BerlinYes01.01.2023New builds from 50 m² + roof renovations≥30 % of the gross roof area (new build) or net roof area (renovation); alternatively, staggered minimum output per residential units (2 kW to 2 WE, 3 kW to 5 WE, 6 kW to 10 WE)SolG Bln
BremenYes01.07.2024 (renovations) / 01.07.2025 (new builds)New builds from 50 m² + major renovations≥50 % of the gross roof area (min. 1 kWp)BremSolarG
Lower SaxonyYes01.01.2025New builds from 50 m² + new roof covering≥50 % of the (renewed) roof area§ 32a NBauO
North Rhine-WestphaliaYes01.01.2025 (new builds) / 01.01.2026 (renovations)New builds + complete roof covering renewal≥30 % of the roof area / flat rate: 3–8 kWp (buildings up to 10 WE)BauO NRW
Schleswig-HolsteinYes29.03.2025 (transitional period for ongoing building applications until 29.03.2026)New builds (residential and non-residential buildings); for non-residential buildings also roof refurbishment >10 % of the roof area≥25 % of the suitable roof areaEWKG § 26
HesseNo (for private residential buildings) - an obligation exists only for buildings owned by the Land (since 16.11.2022) and new car parks >50 parking spacesnew builds/refurbishments owned by the Land, large car parksHEG
HamburgNo
Rhineland-PalatinateNo
BrandenburgNo
Mecklenburg-Western PomeraniaNo
SaxonyNo
Saxony-AnhaltNo
ThuringiaNo
SaarlandNo

Exceptions (across federal states): Listed building protection, north-facing orientation, shading, roof <50 m², not technically/economically feasible. Fines for non-compliance: up to 50.000 € (NRW), retrofitting deadline usually 1–2 Jahre - applies only to federal states with a real (not merely 'should') obligation. Note: Hamburg and Rhineland-Palatinate, contrary to earlier reports, have no active solar obligation (as at 05/2026).