Skip to main content

No-Stopping Signs in Berlin

Obtain your permit, learn about installation, compare rental options and check district rules.

Last updated: November 2025

Setting up no-stopping zone (Halteverbot) signs in Berlin costs a minimum fee of € 21. Signs must be placed 72 hours before they take effect. The authority only issues the traffic order - you must arrange the actual signs separately. Here's everything you need to know about permits, installation and rental options.

Permits

The minimum fee for an Order for a temporary no-stopping zone is € 21. You pay this fee to the Road Traffic Authority (Straßenverkehrsbehörde) in your district. The actual costs may be higher depending on the length of the zone and duration.

The authority only provides the traffic order. You must obtain and install the traffic signs separately. Many applicants forget this important point when planning.

For the permit you need an informal application (formloser Antrag) with the following information:

  • Exact address and street section
  • Desired time period (date and time)
  • Reason for the no-stopping zone (moving, construction, event)
  • Your contact details as applicant

Processing time (Bearbeitungszeit) averages 4 weeks. In districts like Charlottenburg-Wilmersdorf or Friedrichshain-Kreuzberg it can take 6 to 10 weeks. Plan ahead and submit your application early. The legal basis is StVO § 46 Abs. 1 Nr. 11.

Installation

Traffic signs must be placed no later than 72 hours before they take effect. This deadline is legally required and cannot be shortened. Violations result in fines and make the no-stopping zone invalid.

You have several options for installing and removing the signs:

  1. Hiring a construction site security company
  2. Self-installation (only with valid order)
  3. Combination of professional service and self-service

Professional companies handle the complete process. They deliver the signs, install them on time and collect them afterwards. Costs are usually between € 80 and € 150 in addition to the authority fee.

For self-installation you must consider these points:

  • Signs must correspond to traffic signs 283 or 286
  • Installation must be clearly visible at the roadside
  • Maintain minimum distance to intersections and driveways
  • Remove signs immediately after expiry

Signs must be securely and weatherproof mounted. Fallen or damaged signs make the no-stopping zone invalid. Therefore check the proper condition regularly.

Rental

Traffic signs for no-stopping zones can be rented from various providers. Rental costs range between € 15 and € 30 per sign per day. For a 3-day move expect about € 45 to € 90 per sign.

The following providers rent no-stopping signs in Berlin:

  • Construction site security and traffic technology companies
  • Moving companies (often as additional service)
  • Specialized sign rental companies
  • Some hardware stores and tool rental shops

When selecting a provider, ensure complete service. Reputable rental companies offer delivery, installation, monitoring and removal from one source. They also assume liability for proper installation.

Total costs for a rented no-stopping zone consist of authority fee plus sign rental plus service. For a 20-meter no-stopping zone over 3 days you pay approximately € 150 to € 250 total. Find more about all costs in the cost guide.

Before hiring, verify that the provider can meet the 72-hour deadline. Late installation makes your no-stopping zone invalid and you are liable for damages. Return to the no-stopping overview for more important information.

All information without guarantee. Only the responsible authority provides binding information.

Frequently Asked Questions

Answers to the most common questions about the process.

How far in advance must no-stopping signs be placed?

Signs must be placed 72 hours before they take effect. This deadline is legally required and cannot be shortened.

Where do I get the traffic signs?

The authority only issues the order. You must rent the signs separately from construction site security companies or sign rental providers.

What does renting no-stopping signs cost?

Rental costs range between € 15 and € 30 per sign per day. Service fees for installation and removal are usually added.

Can I install the signs myself?

Yes, you can install the signs yourself. You must observe the 72-hour deadline and correct positioning.

What happens with late sign installation?

With late installation the no-stopping zone is invalid. You are liable for damages and may receive fines.

Signage Rules by District

Check district-specific rules for signage lead times and documentation requirements.

Wappen Mitte

Mitte

Varies

Signs in Mitte →

Wappen Friedrichshain-Kreuzberg

Friedrichshain-Kreuzberg

Varies

Signs in Friedrichshain-Kreuzberg →

Wappen Pankow

Pankow

Varies

Signs in Pankow →

Wappen Charlottenburg-Wilmersdorf

Charlottenburg-Wilmersdorf

Varies

Signs in Charlottenburg-Wilmersdorf →

Wappen Spandau

Spandau

Varies

Signs in Spandau →

Wappen Steglitz-Zehlendorf

Steglitz-Zehlendorf

Varies

Signs in Steglitz-Zehlendorf →

Wappen Tempelhof-Schöneberg

Tempelhof-Schöneberg

Varies

Signs in Tempelhof-Schöneberg →

Wappen Neukölln

Neukölln

Varies

Signs in Neukölln →

Wappen Treptow-Köpenick

Treptow-Köpenick

Varies

Signs in Treptow-Köpenick →

Wappen Marzahn-Hellersdorf

Marzahn-Hellersdorf

Varies

Signs in Marzahn-Hellersdorf →

Wappen Lichtenberg

Lichtenberg

Varies

Signs in Lichtenberg →

Wappen Reinickendorf

Reinickendorf

Varies

Signs in Reinickendorf →