The council of the state capital Düsseldorf adopted the municipal heat plan on 18 June 2026, before the federal deadline of 30 June 2026. The plan sets out the pathway to a climate-neutral heat supply by 2045.

The municipal programme “Klimafreundliches Wohnen und Arbeiten in Düsseldorf” is still being revised, and new applications are temporarily suspended. Applications already submitted or approved continue under the old rules.

In NRW, progres.nrw offers attractive geothermal grants. A special feature of Düsseldorf: since 2026, Henkel waste heat has been feeding the Garath district heating network.

See also: Nationwide basis. KfW 458, GEG and technical minimum requirements apply in Düsseldorf without restriction.

Funding in Düsseldorf

ItemValue
Klimafreundliches Wohnen und Arbeitenstill being revised, no new applications for the time being
KfW 458 (federal funding)active
progres.nrw Klimaschutztechnikactive until 30 June 2027, up to 12.000 EUR for geothermal energy in existing buildings
Stadtwerke Düsseldorf heat pump tariff Düsselstrom Naturwärmeactive

Details on KfW 458 are available in the Nationwide basis. The former Düsseldorf city bonus of up to 4.250 EUR has been frozen as part of the programme revision. The city expects updated terms during 2026.

Stadtrecht 19.303 Klimafreundliches Wohnen Düsseldorf

Application process and responsible bodies

Lower water authority of the City of Düsseldorf

The lower water authority is based in the Umweltamt. It approves geothermal probes and groundwater heat pumps.

Umweltamt Düsseldorf

Bauaufsicht Düsseldorf

Minimum clearances for heat pumps have been abolished in NRW since 1 January 2024.

Stadtwerke Düsseldorf (SWD)

SWD offers heat pump tariffs as well as its own heat pump advice and rental service.

Service telephone: 0211 821-2222

swd-ag.de

Bezirksregierung Arnsberg

Administers the progres.nrw programme across the state.

Status of municipal heat planning

StepDate
Public consultation on the draft19 December 2025 to 30 January 2026
Adoption by the council18 June 2026
Climate-neutral DüsseldorfTarget 2045

Municipal heat planning in Düsseldorf

Local features

Henkel waste heat for Garath

As early as 2026, a plant for feeding industrial waste heat into the Garath district heating network will be commissioned in cooperation with Henkel. Owners connected to the Garath network benefit from increasingly green district heating.

Stadtwerke tariff Düsselstrom Naturwärme

SWD offers a special heat pump tariff with a reduced electricity price. Anyone registering the heat pump at the house connection as a controllable consumption device under § 14a EnWG also receives a reduction in network charges.

Garath pilot area

Düsseldorf is testing a combination of industrial waste heat and heat pumps in the Garath district for a climate-neutral neighbourhood.

Frequently asked questions

What Düsseldorf funding can I currently receive for my heat pump?

The municipal programme “Klimafreundliches Wohnen und Arbeiten” is suspended for new applications. Federal KfW 458 funding and progres.nrw are active. SWD also offers heat pump tariffs.

When will new applications be available again in Düsseldorf?

The city has not given a fixed date. Updated terms are expected during 2026.

Who administers progres.nrw funding?

Bezirksregierung Arnsberg is responsible across the state.

Does Düsseldorf have a heat plan?

Yes. The council adopted the municipal heat plan on 18 June 2026, before the federal deadline of 30 June 2026.

Where can I obtain industrial waste heat as a heat source?

In the Garath district. Henkel feeds industrial waste heat into the local district heating network, and owners there benefit through connection to the district heating network.