Legal basis

  • EEG 2023 – feed-in tariff and funding (federal level)
  • Solarspitzengesetz – requirement for smart meter and control unit for new systems from 7 kWp (since 25.02.2025); without a control unit, the grid operator permanently limits feed-in to 60 % of installed capacity
  • § 32a NBauO (Niedersächsische Bauordnung) – solar requirement for new builds and roof renovations

Solar requirement in Niedersachsen

FeatureRule
New buildsRequired since 01.01.2025 (from 50 m² roof area)
Roof renovationsRequired since 01.01.2026 (where newly created or renewed roof area is from 50 m²)
Minimum capacity≥50 % of the (renewed) roof area
Legal basis§ 32a NBauO
ExemptionsHeritage protection, unsuitable roof areas, including north-facing orientation and shading, thatch/wood/glass roofs, unreasonable economic burden (payback period over 20 Jahre)

The 50% rule refers to the building's entire roof area. Edge and technical areas, clearance areas, roof windows and unfavourably oriented areas (N, NNE, NNW) are already included.


Official obligations

StepRequirementThreshold
1Notify the grid operatorall systems
2Register in MaStRall systems
3Smart meter + control unitmandatory installation from 7 kWp; voluntary at 2–7 kWp, otherwise 60 % feed-in limitation
4Tax officefrom >30 kWp

Planning permission: not required for roof-mounted systems. Exceptions: heritage protection, ground-mounted systems.


Grid operators

RegionGrid operator
Hannoverenercity Netz
Braunschweig / East HannoverAvacon Netz
Osnabrück / OldenburgWestnetz / SWO Netz
Lüneburg / North HannoverE.DIS / Avacon
Find your grid operator: Postcode search at solar.red/netzbetreiber

Processing time: 4–8 Wochen | Statutory deadline up to 30 kWp: 4 Wochen (EEG 2024)


Funding in Niedersachsen

No direct standalone state grant for private PV systems. However, NBank funds PV as part of a combined package of measures.

NBank – Klimaschutz und Energieeffizienz

FeatureDetails
TypeGrant (not a loan)
ConditionPV alone is not eligible for funding – at least 2 coordinated climate protection measures and evidence of at least 50 % CO₂ savings are required
Grant amountup to 45 % of eligible investment costs
Applicationnbank.de
ProgrammeTypeAvailable
NBank Klimaschutz und EnergieeffizienzGrant (only as part of a package of measures)Yes
KfW 270Loan (federal level)Yes
EEG feed-in tariffTariffYes
Standalone state grant for PVGrantNo

Municipal grants (selection) – as at 07/2026

CityFundingDetails
Hannover / Region (proKlima)DachVollToll: 100 €/kWp, max. 1.000 €/building (from 2 kWp). SolarGrünDach with PV: 200 €/kWp, max. 6.000 €. Façade PV: 300 €/kWp, max. 9.000 €Current funding period since 01.01.2026, expected until 31.10.2026. A; application before construction starts
BraunschweigPlug-in PV (balcony power plant): 200 € grant, +150 € bonus for Bürgergeld/basic income support/housing benefit/BAföG (max. 350 €). Vertical PV (façade/fence): 100 €/kWpApplications since 15.04.2026 via the city's service portal
Osnabrück"Osnabrück saniert" / climate protection initiative: up to 1.000 € per projectApply before measures begin

EEG feed-in tariff (Q2/Q3 2026)

System sizePartial feed-inFull feed-in
up to 10 kWp7,78 ct/kWh12,34 ct/kWh
10–40 kWp6,73 ct/kWh10,35 ct/kWh
40–100 kWp5,50 ct/kWh10,35 ct/kWh

Valid: 01.02.2026 – 31.07.2026 | From 01.08.2026, reduction of 1 % (six-monthly reduction under § 49 EEG 2023). Systems already commissioned retain their tariff for 20 Jahre.


Installation steps in Niedersachsen

  1. Check the roof – where the solar requirement applies (new build/roof renovation from 50 m²): check the 50% rule and exemptions
  2. Check and apply for municipal grants (before placing the order)
  3. Check the NBank programme – relevant only if PV is part of a larger package of climate protection measures
  4. Commission a certified specialist company
  5. Notify the grid operator – 4–8 Wochen lead time
  6. Register in MaStR, arrange smart meter installation
  7. Commissioning + acceptance record

Note on grid operators: The table above lists common grid operators – it is not exhaustive. The grid operator actually responsible depends solely on the postcode . Find it by postcode search: solar.red/netzbetreiber

How to submit applications

1. Feed-in application to the grid operator

  1. Identify the grid operator: Postcode search at solar.red/netzbetreiber
  2. Online portal of the grid operator (legally required since Jan. 2025)
  3. Complete the form: location, planned kWp capacity, feed-in type
  4. Wait for approval – 4 Wochen deadline (up to 30 kWp); automatically approved if there is no response after 1 month
  5. Tip: The installer often handles notification – ask when requesting a quote

2. MaStR registration (Marktstammdatenregister)

  1. Portal: marktstammdatenregister.de
  2. Deadline: within 1 month after commissioning
  3. Required: system capacity (kWp), installation date, site postcode
  4. Tip: Many installers handle the MaStR registration too, clarify this in the quote

3. Municipal funding (e.g. Hannover proKlima)

  1. Hannover / region: proklimaev.de – depending on the module 100–300 €/kWp, application before construction begins
  2. Braunschweig: City Service Portal – plug-in PV or vertical PV, since 15.04.2026
  3. Osnabrück: "Osnabrück saniert" – up to 1.000 €, application before measures begin
  4. Other cities: enquire directly with the municipal utilities or city authority

4. KfW 270 (federal level)

  1. Through your bank apply
  2. Portal: kfw.de/270
  3. Submit application before commissioning