AmtsGuide

Solar system – Hesse

Legal basis

  • EEG 2023 – feed-in tariff and funding (federal level)
  • Solarspitzengesetz – smart meter and control box required for new systems from 7 kWp (since 25.02.2025); without a control box, the grid operator permanently limits feed-in to 60 % of installed capacity
  • § 9a Hessisches Energiegesetz (HEG), passed in November 2022 – solar requirement for state-owned buildings and car parks; no solar requirement for private residential buildings

Solar requirement in Hessen

No solar requirement for private residential buildings – neither for new buildings nor existing buildings. An extension to private households is not currently planned in concrete terms, and there is no timetable.

A genuine solar requirement has existed since November 2022 under § 9a HEG, but only for state-owned buildings with more than 50 m² of usable floor area (new and existing buildings), as well as for new car parks from 35 parking spaces (state-owned) or from 50 parking spaces (not state-owned). Private owners are not affected.


Official requirements

StepRequirementThreshold
1Notify the grid operatorall systems
2Register in MaStRall systems
3Smart meter + control boxmandatory installation from 7 kWp; voluntary at 2–7 kWp, otherwise 60 % feed-in curtailment
4Tax officefrom >30 kWp

Planning permission: not required for rooftop systems. Exceptions: listed-building protection, ground-mounted systems.


Grid operators

RegionGrid operator
Frankfurt / Rhine-MainMainova / Netzdienste Rhein-Main
KasselStädtische Werke Kassel
WiesbadenESWE Versorgung
DarmstadtENTEGA Netz
Rural areasE.ON / Westnetz (in part)
Find your grid operator: postcode search at solar.red/netzbetreiber

Processing time: 4–8 Wochen | Statutory deadline up to 30 kWp: 4 Wochen (EEG 2024)


Funding in Hessen

WIBank – Hessian loan for PV

FeatureDetails
TypeLow-interest loan + interest subsidy from the state
Loan amount10.000 € – 50.000 €
Interest subsidy1,5 % p.a. from the state of Hessen for the 10-year fixed-interest period
EquityAt least 10 % required; loan covers up to 90 % of investment costs
Minimum term / fixed-interest period10 Jahre
EligiblePV up to 20 kWp, storage, control/regulation technology
RequirementOwner-occupied residential building, private builders/owners
ApplicationWIBank customer portal online

Municipal grants (selection) – as at 07/2026

CityPV systemSpecial features
FrankfurtKlimabonus: 20–30 % of costs depending on the measureMax. 50.000 €; the funding pot for balcony solar systems was temporarily exhausted in mid-2025, and has since been topped up again
DarmstadtBalcony solar systems only: 200 € (1 module) or 400 € (2 modules), max. 50 % of purchase and installation costsTenants are also eligible to apply; no separate funding for large rooftop systems
Bad Homburg300 €/kWp, max. 6.000 € (permanently installed modules)Solar roof tiles: 400 €/kWp, max. 8.000 €. Balcony solar system: 200 €/module, max. 50 % of equipment costs. Storage: 300 €/kWh usable capacity, max. 3.000 €
KasselBalcony solar system: flat rate of 150 €For participants in the Stromspar-Check, up to 500 € after assessment
WiesbadenCheck locally
Municipal programmes change frequently – always check availability directly with the city.

New from June 2026: energy sharing

The new Energiewirtschaftsgesetz permits sharing self-generated solar electricity with neighbours from June 2026 – relevant for apartment buildings.


EEG feed-in tariff (Q2/Q3 2026)

System sizePartial feed-inFull feed-in
up to 10 kWp7,78 ct/kWh12,34 ct/kWh
10–40 kWp6,73 ct/kWh10,35 ct/kWh
40–100 kWp5,50 ct/kWh10,35 ct/kWh

Valid: 01.02.2026 – 31.07.2026 | From 01.08.2026, reduction of 1 % (six-monthly reduction under § 49 EEG 2023). Systems already commissioned retain their tariff rate for 20 Jahre.


Installation steps in Hessen

  1. Check the roof (orientation, structural capacity)
  2. Apply for the WIBank loan (before placing an order)
  3. Check and apply for a municipal grant – check the offer in your city to see whether it funds a balcony solar system or a rooftop system
  4. Appoint a certified specialist firm
  5. Notify the grid operator – 4–8 Wochen lead time
  6. Register in MaStR, arrange smart meter installation
  7. Commissioning + acceptance report

Grid operator note: The table above lists common grid operators – it is not exhaustive. The grid operator actually responsible depends solely on the postcode . Find it using the postcode search: solar.red/netzbetreiber

How to submit applications

1. Feed-in application to the grid operator

  1. Identify the grid operator: postcode search at solar.red/netzbetreiber
  2. Online portal of the grid operator (a legal requirement since Jan. 2025)
  3. Complete the form: location, planned kWp capacity, feed-in type
  4. Wait for approval – 4 Wochen deadline (up to 30 kWp); automatically approved if no response after 1 month
  5. Tip: the installer often handles the notification – ask when requesting a quote

2. MaStR registration (Marktstammdatenregister)

  1. Portal: marktstammdatenregister.de
  2. Deadline: within 1 month of commissioning
  3. Required: system capacity (kWp), installation date, site postcode
  4. Tip: many installers also handle the MaStR registration – clarify this in the quote

3. WIBank loan (Hessen)

Submit the application before placing an order.
  1. Portal: WIBank customer portal – wibank.de
  2. Online application complete: investment amount, system size, proof of ownership
  3. Loan approved → then appoint the installer
  4. Interest subsidy (1,5 % p.a.) is automatically provided by the state of Hessen

4. Municipal funding (e.g. Frankfurt Klimabonus)

  1. Frankfurt: stadtplanungsamt.frankfurt.de → Klimabonus → 20–30 % of costs, max. 50.000 €
  2. Other cities: ask the municipal utility or city authority directly – clarify in advance whether a balcony solar system or rooftop system is funded
  3. Submit the application before installation

5. KfW 270 (federal level)

  1. Through your bank apply
  2. Portal: kfw.de/270