Legal basis

  • EEG 2023 – feed-in tariff and funding (federal level)
  • Solarspitzengesetz – obligation to have a smart meter and control unit for new installations from 7 kWp (since 25.02.2025); without a control unit, the grid operator permanently limits feed-in to 60 % of installed capacity
  • No state-specific solar obligation for private residential buildings

Solar obligation in Sachsen

No solar obligation for private residential buildings, neither for new builds nor existing buildings. Since 2024, a PV obligation has applied to state-owned properties as part of the Sächsisches Klima- und Energieprogramm – but this affects only state buildings and individual municipal buildings, not private owners.


Official obligations

StepObligationThreshold
1Register with grid operatorall installations
2Register in MaStRall installations
3Smart meter + control unitmandatory installation from 7 kWp; voluntary at 2–7 kWp, otherwise 60 % feed-in limitation
4Tax officefrom >30 kWp

Planning permission: not required for roof-mounted installations. Exceptions: listed-building protection, ground-mounted installations.


Grid operators

RegionGrid operator
Most of SachsenMITNETZ (Mitteldeutsche Netzgesellschaft)
LeipzigNetz Leipzig
DresdenSachsenNetze GmbH (formerly DREWAG Netz, renamed since 2021)
Chemnitzeins energie in sachsen
Find your grid operator: postcode search at solar.red/netzbetreiber

Processing time: 4–8 Wochen | Statutory deadline up to 30 kWp: 4 Wochen (EEG 2024)


Funding in Sachsen

Important update: The following two Saxon state programmes expired on 30.06.2026. New applications have not been possible since then (as of 07/2026). No successor programme is currently known – ask SAB directly about a possible relaunch.

SAB – Sachsenkredit Energie und Speicher (expired)

FeatureDetails
StatusProgramme expired on 30.06.2026, no new applications possible
Type (when it was running)Loan + repayment grant
Target groupPV installations 30 kWp to 1 MWp + storage
Repayment grantup to 20 % for storage, up to 10 % for other measures

Balcony power systems for tenants (expired)

FeatureDetails
StatusTenant quota expired on 30.06.2026, no new applications possible
Funding (when it was running)300 € flat rate per dwelling unit
Owner quotahad already been exhausted beforehand
ProgrammeTypeAvailable
KfW 270Loan (federal level)Yes
EEG feed-in tariffRemunerationYes
SachsenkreditLoan + grantNo, expired 30.06.2026
Balcony power system grantGrantNo, expired 30.06.2026

EEG feed-in tariff (Q2/Q3 2026)

Installation sizePartial feed-inFull feed-in
up to 10 kWp7,78 ct/kWh12,34 ct/kWh
10–40 kWp6,73 ct/kWh10,35 ct/kWh
40–100 kWp5,50 ct/kWh10,35 ct/kWh

Valid: 01.02.2026 – 31.07.2026 | From 01.08.2026, reduction of 1 % (six-monthly reduction under § 49 EEG 2023). Installations already commissioned retain their tariff rate for 20 Jahre.


Installation steps in Sachsen

  1. Check roof (orientation, structural integrity)
  2. Check state funding: SAB Sachsenkredit and the balcony power system grant have currently expired; only KfW 270 and the EEG tariff remain available
  3. Commission a certified specialist company
  4. Register with grid operator – 4–8 Wochen lead time
  5. Register in MaStR, have smart meter installed
  6. Commissioning + acceptance report

Note on grid operators: The table above shows common grid operators – it is not exhaustive. The grid operator actually responsible depends solely on the postcode . Find it using the postcode search: solar.red/netzbetreiber

How to submit the applications

1. Feed-in application to the grid operator

  1. Find the grid operator: postcode search at solar.red/netzbetreiber
  2. Online portal of the grid operator (legally required since Jan. 2025)
  3. Complete the form: location, planned kWp capacity, feed-in type
  4. Wait for approval – 4 Wochen deadline (up to 30 kWp); automatically approved if there is no response after 1 month
  5. Tip: Installer often handles registration – ask when requesting a quote

2. MaStR registration (Marktstammdatenregister)

  1. Portal: marktstammdatenregister.de
  2. Deadline: within 1 month after commissioning
  3. Required: installation capacity (kWp), installation date, site postcode
  4. Tip: Many installers also complete the MaStR registration – clarify in the quote

3. KfW 270 (federal level – currently the only funding in Sachsen)

  1. Apply via your bank.
  2. Portal: kfw.de/270
  3. Submit the application before placing the order
  4. Ask SAB about a possible relaunch of Sachsenkredit