Solar installation – Baden-Württemberg

Legal basis

  • EEG 2023 – feed-in tariff and funding (federal level)
  • Solarspitzengesetz – obligation to have a smart meter and control unit for new installations from 7 kWp (since 25.02.2025); without a control unit, the grid operator permanently reduces feed-in to 60 % of installed capacity
  • LBO BW (Landesbauordnung Baden-Württemberg) – solar obligation for new buildings, refurbishments and larger parking areas

Solar obligation in Baden-Württemberg

Baden-Württemberg was the first German state with a statutory solar obligation.

FeatureRule
New buildings (residential buildings)Mandatory since 01.05.2022
New buildings (non-residential buildings)Mandatory for building applications from 01.01.2022
Roof refurbishmentsMandatory since 01.01.2023 (>50 % of roof covering renewed)
Open parking spacesMandatory since 01.01.2022 for more than 35 spaces
Minimum capacity≥60 % of suitable roof area, alternatively minimum module area or 0,06 kWp per m² of built-up site area
Legal basisLBO BW
ExemptionsListed-building protection, north-facing orientation, shading, roof <50 m², economic unreasonableness

Official obligations

StepRequirementThreshold
1Register with the grid operatorall installations
2Register in MaStRall installations
3Smart meter + control unitmandatory installation from 7 kWp; voluntary for 2–7 kWp, otherwise 60 % feed-in reduction
4Tax officefrom >30 kWp

Building permit: not required for roof installations. Exceptions: listed-building protection, ground-mounted installations.


Grid operators

RegionGrid operator
Most of BWEnBW Netze BW
StuttgartStadtwerke Stuttgart
Freiburgbadenova Wärmeplus
KarlsruheStadtwerke Karlsruhe
UlmSWU Netze
Find your grid operator: postcode search at solar.red/netzbetreiber

Processing time: 4–8 Weeks | Statutory deadline up to 30 kWp: 4 Weeks (EEG 2024)


Funding in Baden-Württemberg

L-Bank – “Wohnen mit Zukunft: Photovoltaik”

FeatureDetails
TypeLow-interest loan (not a grant)
Financing scopeUp to 100 % of investment costs
Minimum loan5.000 €
Term5–30 Jahre, up to 5 repayment-free years, fixed nominal interest rate for the first 10 Jahre
EligiblePV system, battery storage, roof/facade/carport PV
ConditionOwner occupation of at least one residential unit
Applicationl-bank.de, via your bank
Can be combined withEEG feed-in tariff, KfW 270, municipal grants

Municipal grants (selection) – as of 07/2026

CityStatusDetails
Stuttgart (Solaroffensive)Active, new guideline since May 2026300 €/kWp for rooftop PV, 400 €/kWp for green-roof/façade PV; storage eligible up to 1 kWh/kWp; max. 30.000 € per application; apply before commissioning work (except balcony PV: up to 3 Monate after purchase)
Karlsruhe (KlimaBonus)Funding pot 2026 exhaustedBudget of 1,3 million euros fully committed, currently no new applications possible; alternatively use L-Bank + federal funding
FreiburgYesDetails from the city
HeidelbergYesDetails from the city
MannheimYesDetails from the city
LudwigsburgBalcony power plant: 150 €
Municipal programmes change frequently, always check the current status directly with the city.

EEG feed-in tariff (Q2/Q3 2026)

Uniform nationwide, applies unchanged in Baden-Württemberg.

System sizePartial feed-inFull feed-in
up to 10 kWp7,78 ct/kWh12,34 ct/kWh
10–40 kWp6,73 ct/kWh10,35 ct/kWh
40–100 kWp5,50 ct/kWh10,35 ct/kWh

Valid: 01.02.2026 – 31.07.2026 | From 01.08.2026, reduction of 1 % (six-monthly reduction under § 49 EEG 2023). Systems already commissioned retain their tariff for 20 Jahre.


Installation steps BW

  1. Check the roof, where solar obligation applies: exemption only with written justification
  2. Apply for an L-Bank loan (before commissioning work)
  3. Check and apply for municipal grants, confirm the status first (e.g. Karlsruhe currently exhausted)
  4. Commission a certified specialist contractor
  5. Register with the grid operator (4–8 W weeks' lead time)
  6. Register in MaStR, have a smart meter installed
  7. Commissioning + acceptance report

Grid operator note: The table above shows common grid operators, it is not complete. The grid operator actually responsible depends solely on the postcode and not on the federal state. Find it by postcode search: solar.red/netzbetreiber

How to apply

1. Feed-in application to the grid operator

  1. Find the grid operator: Postcode search at solar.red/netzbetreiber
  2. Online portal of the grid operator (legally required since Jan. 2025)
  3. Complete the form: location, planned kWp capacity, feed-in type (partial or full feed-in)
  4. Wait for approval , statutory deadline: 4 W weeks (up to 30 kWp); automatically approved if no response after 1 month
  5. Tip: In many cases, the installer handles registration, ask when requesting a quote

2. MaStR registration (Marktstammdatenregister)

  1. Portal: marktstammdatenregister.de (Bundesnetzagentur)
  2. Deadline: within 1 month after commissioning (legal requirement)
  3. Required: system capacity (kWp), installation date, site postcode
  4. Tip: Many installers also complete the MaStR entry, clarify this in the quote

3. L-Bank loan (Baden-Württemberg)

Submit the application before commissioning the installer.
  1. Portal: l-bank.de → Wohnen mit Zukunft: Photovoltaik
  2. Apply through your bank , L-Bank works with partner banks (not directly)
  3. Form: investment total, system size, proof of building ownership
  4. Wait for approval → then commission the installer
  5. Municipal grant (e.g. Stuttgart), apply in parallel to the relevant city authority, Karlsruhe currently exhausted

4. KfW 270 (federal level)

  1. Through your bank apply (not directly to KfW)
  2. Portal for an overview: kfw.de/270
  3. Submit the application before commissioning work