Legal basis

  • EEG 2023 – feed-in tariff and funding (federal level)
  • Solarspitzengesetz – requirement for a smart meter and control unit for new installations from 7 kWp (since 25.02.2025); without a control unit, the grid operator permanently limits feed-in to 60 % of installed capacity
  • BayBO Art. 44a (Bayerische Bauordnung) – solar requirement for new commercial buildings; target provision for residential buildings

Solar requirement in Bavaria

Important distinction: for residential buildings, there is no genuine obligation, only a “target provision” – no fines or penalties apply if no installation is fitted.

FeatureRule
New commercial buildings (non-residential buildings)Genuine obligation since 01.07.2023 – breach is subject to a fine
Commercial roof renovationsGenuine obligation since 01.01.2025
New residential buildingsTarget provision since 01.01.2025 (for planning applications/complete building documents from this date) – no penalty for non-compliance
Complete roof renewal on residential buildingsAlso only a target provision, since 01.01.2025
Minimum capacity≥1/3 of suitable roof area
Alternative for roof renovationSolar thermal energy fulfils the requirement if it covers at least 15 % of heating/cooling demand
Legal basisBayBO Art. 44a
Exemptions (for non-residential buildings)Heritage protection, north-facing orientation, shading, unreasonable economic burden

Official obligations

StepRequirementThreshold
1Register with the grid operatorall installations
2Register in MaStRall installations
3Smart meter + control unitmandatory installation from 7 kWp; voluntary for 2–7 kWp, otherwise 60 % feed-in restriction
4Tax officefrom >30 kWp

Planning permission: not required for roof-mounted installations. Exceptions: heritage protection, ground-mounted installations.


Grid operator

RegionGrid operator
Most of Bavaria (rural areas)Bayernwerk Netz
MunichStadtwerke München (SWM)
NurembergN-ERGIE
AugsburgStadtwerke Augsburg
RegensburgStadtwerke Regensburg
Find your grid operator: postcode search at solar.red/netzbetreiber

Processing time: 4–8 W weeks | Statutory deadline up to 30 kWp: 4 W weeks (EEG 2024)


Funding in Bavaria

State level

No statewide grant programme by the Free State for private PV installations (as at 07/2026). The former “10.000-Häuser-Programm” has expired and was not renewed. Bavaria relies primarily on nationwide instruments:

ProgrammeTypeNote
KfW 270Loan (federal level)Low-interest for PV + storage
EEG feed-in tariffPaymentGuaranteed for 20 Jahre
LfA Förderbank BayernLoans for businessesNot for private households
Tip: Check municipal programmes in Bavarian cities – many municipal utilities offer their own grants.

Municipal grants (selection) – as at 07/2026

CityFunding
Regensburg100 €/kWp, max. 1.500 € for permanently installed PV systems; plus a 200 € bonus for installation on a listed building, green roof or façade
MunichStadtwerke München: check locally – the city's funding programmes primarily target energy advice, not direct PV grants
Nuremberg100 € balcony solar system
AugsburgAsk Stadtwerke
WürzburgAsk Stadtwerke
Municipal programmes vary greatly – enquire directly with the Stadtwerke or the city.

EEG feed-in tariff (Q2/Q3 2026)

Standardised nationwide – applies unchanged in Bavaria.

Installation sizePartial feed-inFull feed-in
up to 10 kWp7,78 ct/kWh12,34 ct/kWh
10–40 kWp6,73 ct/kWh10,35 ct/kWh
40–100 kWp5,50 ct/kWh10,35 ct/kWh

Valid: 01.02.2026 – 31.07.2026 | From 01.08.2026, reduction of 1 % (six-monthly reduction under § 49 EEG 2023). Installations already in operation retain their tariff rate for 20 Jahre.

Bavaria advantage: Above-average solar irradiation (~1.200–1.300 kWh/m²/year in southern Bavaria) – higher yields than the national average.

Installation steps in Bavaria

  1. Check the roof – only a target provision applies to residential buildings (no penalty), while commercial/non-residential buildings have a genuine obligation subject to a fine
  2. Check the municipal funding programme (Stadtwerke or city)
  3. Commission a certified specialist company
  4. Register with the grid operator (4–8 W weeks' lead time)
  5. Register in MaStR, arrange smart meter installation
  6. Commissioning + acceptance report

Grid operator note: The table above shows common grid operators – it is not complete. The grid operator that is actually responsible depends solely on the postcode rather than the federal state. Find it using the postcode search: solar.red/netzbetreiber

How to submit applications

1. Feed-in application to the grid operator

  1. Find the grid operator: postcode search at solar.red/netzbetreiber
  2. Online portal of the grid operator (legally required since Jan. 2025)
  3. Complete the form: location, planned kWp capacity, feed-in type
  4. Wait for approval – 4 W-week deadline (up to 30 kWp); automatically approved if there is no response after 1 month
  5. Tip: The installer often handles the registration – ask when requesting a quote

2. MaStR registration (Marktstammdatenregister)

  1. Portal: marktstammdatenregister.de
  2. Deadline: within 1 month of commissioning
  3. Required: installation capacity (kWp), installation date, site postcode
  4. Tip: Many installers also handle MaStR – clarify this in the quote

3. Municipal funding in Bavaria

As there is no state programme, municipal funding is relevant:

  1. Contact your city's Stadtwerke / municipal office (e.g. SWM Munich, N-ERGIE Nuremberg, Stadtwerke Regensburg)
  2. Submit the application before installation (usually a requirement)
  3. Websites: the relevant city's Stadtwerke → “Solar / Renewable Energy” section

4. KfW 270 (federal level)

  1. Apply through your bank (not directly through KfW)
  2. Portal: kfw.de/270
  3. Application before commissioning work