Legal basis

  • EEG 2023 – feed-in tariff and funding (federal level)
  • Solarspitzengesetz – requirement for a smart meter and control unit for new systems from 7 kWp (since 25.02.2025); without a control unit, the grid operator permanently limits feed-in to 60 % of installed capacity
  • Solargesetz Rheinland-Pfalz – solar requirement for new commercial buildings (since 01.01.2023) and new public buildings/roof refurbishments (since 01.01.2024), in each case from 100 m² usable floor area; PV-ready requirement for new private buildings (since 01.01.2024)

Solar requirement in Rhineland-Palatinate

No full solar requirement for private residential buildings. However, since 1 January 2024, a PV-ready requirement: new buildings must be designed so that a photovoltaic system can be installed later. Actual installation remains voluntary for private owners.

For new commercial buildings with over 100 m² usable floor area, a genuine solar requirement has applied since 1 January 2023. For new public buildings over 100 m² and roof refurbishments of public buildings, it has applied since 1 January 2024.

By the end of 2026, Rhineland-Palatinate must implement the EU Buildings Directive. This is expected to tighten the solar requirement for residential buildings as well.


Official obligations

StepObligationThreshold
1Notify grid operatorall systems
2Register in MaStRall systems
3Smart meter + control unitmandatory installation from 7 kWp; voluntary at 2–7 kWp, otherwise 60 % feed-in limitation
4Tax officefrom >30 kWp

Building permit: not required for roof-mounted systems. Exceptions: listed building protection, ground-mounted systems.


Grid operators

RegionGrid operator
Pfalz / VorderpfalzPfalzwerke Netz
MainzMainzer Netze GmbH
TrierStadtwerke Trier
KoblenzStadtwerke Koblenz
Rural areasWestnetz (in some cases also Energienetze Mittelrhein, EWR Netz, Syna)
Find your grid operator: Postcode search at solar.red/netzbetreiber

Processing time: 4–8 Wochen | Statutory deadline up to 30 kWp: 4 Wochen (EEG 2024)


Funding in Rhineland-Palatinate

No direct grant, but a substantial loan programme from the state development bank for PV systems for self-consumption.

ISB – loan for photovoltaic systems for self-consumption

FeatureDetails
providerInvestitions- und Strukturbank Rheinland-Pfalz (ISB)
TypeLow-interest loan, explicitly for PV systems on residential buildings for self-consumption
Loan amountup to 100.000 € for a 4-person household, plus 5.000 € for each additional household member, up to the amount of the investment costs
Repayment grantup to 25 %, depending on household income and the efficiency house standard achieved (EH 55/EH 85)
Applicationvia your bank
ProgrammeTypeAvailable
ISB loanLow-interest loan + repayment grantYes
KfW 270Loan (federal level)Yes
EEG feed-in tariffPaymentYes
0 % VAT until 30 kWpTaxYes
Direct state grantGrantNo
Tip: Enquire directly about municipal programmes in Mainz, Trier and Koblenz, as availability varies.

EEG feed-in tariff (Q2/Q3 2026)

System sizePartial feed-inFull feed-in
up to 10 kWp7,78 ct/kWh12,34 ct/kWh
10–40 kWp6,73 ct/kWh10,35 ct/kWh
40–100 kWp5,50 ct/kWh10,35 ct/kWh

Valid: 01.02.2026 – 31.07.2026 | From 01.08.2026, reduction of 1 % (six-monthly reduction under § 49 EEG 2023). Systems already commissioned retain their payment rate for 20 Jahre.


Installation steps in Rhineland-Palatinate

  1. Check the roof (orientation, structural capacity). For new builds: note the PV-ready requirement
  2. Check ISB loan (up to 100.000 €, repayment grant of up to 25 % depending on income)
  3. Check municipal funding (Mainz, Trier, Koblenz)
  4. Check KfW 270 loan
  5. Commission a certified specialist company
  6. Register with the grid operator, allow 4–8 W weeks
  7. Register in the MaStR and have a smart meter installed
  8. Commissioning + acceptance record

Note on grid operators: The table above shows common grid operators, but is not exhaustive. The grid operator actually responsible depends solely on the postcode . Find it using the postcode search: solar.red/netzbetreiber

How to submit applications

1. Feed-in application to the grid operator

  1. Find the grid operator: Postcode search at solar.red/netzbetreiber
  2. Online portal of the grid operator (legally required since Jan. 2025)
  3. Complete the form: Location, planned kWp capacity, feed-in type
  4. Wait for approval – 4 W-week deadline (up to 30 kWp); automatically approved if there is no response after 1 month
  5. Tip: The installer often handles registration, ask when requesting a quote

2. MaStR registration (Marktstammdatenregister)

  1. Portal: marktstammdatenregister.de
  2. Deadline: within 1 month of commissioning
  3. Required: System capacity (kWp), installation date, location postcode
  4. Tip: Many installers include MaStR registration, clarify this in the quote

3. ISB loan (Rhineland-Palatinate, main funding)

  1. Through your bank apply
  2. Loan amount depends on household size: up to 100.000 € (4 people), +5.000 € for each additional member
  3. Have eligibility for a repayment grant of up to 25 % checked, depending on income and Effizienzhaus standard
  4. Submit the application before commissioning work

4. KfW 270 (federal level)

  1. Through your bank apply (not directly to KfW)
  2. Portal: kfw.de/270
  3. Submit the application before commissioning work
  4. Enquire directly with the municipal utilities about municipal grants (Mainz, Trier, Koblenz)