Legal basis

  • EEG 2023 – feed-in tariff and funding (federal level)
  • Solarspitzengesetz – smart meter and control box required for new systems from 7 kWp (since 25.02.2025); without a control box, the grid operator permanently reduces feed-in to 60 % of installed capacity
  • § 12a, § 12b Landesbauordnung Saarland – solar requirement for public and commercial buildings and larger new car parks (since 26.04.2025)
  • PV-ready requirement for private new-builds and roof renewals from 50 m² roof area (since 01.09.2025)

Solar requirement in Saarland

No full solar requirement for private residential buildings. However, there is a PV-ready requirement: Since 1 September 2025, new-builds and roof renewals with at least 50 m² roof area must be planned so that a photovoltaic system can be installed later. Immediate installation is not required.

For public and commercial buildings and larger new car parks, however, a genuine solar requirement has applied since 26 April 2025 for new construction or roof refurbishment (§ 12a and § 12b LBO Saarland).

Individual municipalities may additionally introduce their own solar requirement for private residential buildings by local statute. So far, no municipality in Saarland has made use of this option (as at 07/2026).


Official obligations

StepRequirementThreshold
1Register with grid operatorall systems
2Register in MaStRall systems
3Smart meter + control boxmandatory installation from 7 kWp; voluntary at 2–7 kWp, otherwise 60 % feed-in reduction
4Tax officefrom >30 kWp

Planning permission: not required for roof-mounted systems. Exceptions: listed-building protection, ground-mounted systems. For new builds/roof refurbishments from 50 m² roof area: note the PV-ready planning requirement (see above).


Grid operator

RegionGrid operator
Most of SaarlandVSE Verteilnetz GmbH (subsidiary of energis)
SaarbrückenStadtwerke Saarbrücken Netz
Find your grid operator: postcode search at solar.red/netzbetreiber

Processing time: 4–8 Wochen | Statutory deadline up to 30 kWp: 4 Wochen (EEG 2024)


Funding in Saarland

SIKB – Modernisierung selbstgenutztes Wohneigentum (PV explicitly eligible)

FeatureDetails
TypeLow-interest loan
Interest rate1,0 % nominal, fixed for the entire term (up to 30 Jahre)
Funding shareup to 80 % of eligible costs
Maximum loan amountup to 75.000 €
Minimum investment12.500 €
Eligible measuresHeat pumps, PV systems, insulation – PV systems are explicitly eligible, and the loan is aimed in particular at owners wishing to increase their self-consumption of solar electricity
Applicationsikb.de
ProgrammeTypeAvailable
KfW 270Loan (federal level)Yes
EEG feed-in tariffPaymentYes
Direct state PV grantGrantNo

EEG feed-in tariff (Q2/Q3 2026)

System sizePartial feed-inFull feed-in
up to 10 kWp7,78 ct/kWh12,34 ct/kWh
10–40 kWp6,73 ct/kWh10,35 ct/kWh
40–100 kWp5,50 ct/kWh10,35 ct/kWh

Valid: 01.02.2026 – 31.07.2026 | From 01.08.2026, reduction of 1 % (six-monthly reduction under § 49 EEG 2023). Systems already commissioned retain their tariff for 20 Jahre.


Installation steps in Saarland

  1. Check roof (orientation, structural capacity). For new builds/roof refurbishments from 50 m²: note the PV-ready requirement
  2. Check SIKB loan (up to 75.000 €, fixed interest rate 1 %)
  3. Check KfW 270 loan
  4. Appoint a certified specialist contractor
  5. Register with grid operator – 4–8 Wochen lead time
  6. Register in MaStR, have smart meter installed
  7. Commissioning + acceptance record

Note on grid operators: The table above shows common grid operators – it is not exhaustive. The grid operator actually responsible depends solely on the postcode . Find it by postcode search: solar.red/netzbetreiber

How to submit the applications

1. Feed-in application to the grid operator

  1. Identify the grid operator: postcode search at solar.red/netzbetreiber
  2. Online portal of the grid operator (legally required since Jan. 2025)
  3. Complete the form: location, planned kWp capacity, feed-in type
  4. Wait for approval – 4 W weeks' deadline (up to 30 kWp); automatically approved if there is no response after 1 month
  5. Tip: installer often handles the registration – ask when requesting a quote

2. MaStR registration (Marktstammdatenregister)

  1. Portal: marktstammdatenregister.de
  2. Deadline: within 1 month after commissioning
  3. Required: system capacity (kWp), installation date, location postcode
  4. Tip: many installers also handle the MaStR – clarify this in the quote

3. SIKB loan (Saarland)

  1. Portal: sikb.de → Modernisierung selbstgenutztes Wohneigentum
  2. Minimum investment 12.500 €, financing up to 80 % of costs, max. 75.000 €
  3. Submit the application before placing the order

4. KfW 270 (federal level)

  1. Through your bank apply
  2. Portal: kfw.de/270
  3. Submit the application before placing the order