Solar installation – Mecklenburg-Vorpommern

Legal basis

  • EEG 2023 – feed-in tariff and funding (federal level)
  • Solarspitzengesetz – smart meter and control box required for new systems from 7 kWp (since 25.02.2025); without a control box, the grid operator permanently limits feed-in to 60 % of installed capacity
  • No state-specific solar requirement

Solar requirement in Mecklenburg-Vorpommern

No solar requirement at state level (as at 07/2026), neither for private residential buildings nor for commercial or state-owned buildings. Installation remains entirely voluntary. The state government has 2022 expressed its general support for a future solar requirement; a climate protection law is to regulate the details – specific key points or a timetable have not yet been published.


Official obligations

StepRequirementThreshold
1Register with grid operatorall systems
2Register in MaStRall systems
3Smart meter + control boxmandatory installation from 7 kWp; voluntary at 2–7 kWp, otherwise 60 % feed-in curtailment
4Tax officefrom >30 kWp

Planning permission: not required for rooftop systems. Exceptions: listed-building protection, ground-mounted systems.


Grid operators

RegionGrid operator
West MecklenburgWEMAG Netz (the region's largest distribution grid operator)
East Mecklenburg / VorpommernE.DIS Netz (E.ON Group)
RostockStadtwerke Rostock Netz
Find your grid operator: postcode search at solar.red/netzbetreiber

Processing time: 4–8 Wochen | Statutory deadline up to 30 kWp: 4 Wochen (EEG 2024)


Funding in Mecklenburg-Vorpommern

No general state programme for private PV systems. Targeted funding:

ProgrammeTypeDetails
LEKA MV – balcony solar systemsGrantUp to 500 € per housing unit – only for tenants; the allocation is currently sufficiently funded
LEKA MV – balcony solar systems for ownersGrantAllocation fully exhausted – owner applications are currently discouraged, with no prospect of success
Stadtwerke SchwerinLocalStorage grant for a new PV system – enquire directly
KfW 270Loan (federal level)Yes
EEG feed-in tariffTariffYes
LEKA MV = Landesenergie- und Klimaschutzagentur Mecklenburg-Vorpommern: leka-mv.de

EEG feed-in tariff (Q2/Q3 2026)

System sizePartial feed-inFull feed-in
up to 10 kWp7,78 ct/kWh12,34 ct/kWh
10–40 kWp6,73 ct/kWh10,35 ct/kWh
40–100 kWp5,50 ct/kWh10,35 ct/kWh

Valid: 01.02.2026 – 31.07.2026 | From 01.08.2026, reduction of 1 % (six-monthly reduction under § 49 EEG 2023). Systems already commissioned retain their tariff for 20 Jahre.


Installation steps in MV

  1. Check the roof (orientation, structural capacity)
  2. Use LEKA advice (free)
  3. Tenants: check LEKA balcony solar grant. Owners: allocation is exhausted, so applying is not worthwhile
  4. Stadtwerke Schwerin: enquire about storage funding, if applicable
  5. Commission a certified specialist contractor
  6. Register with the grid operator – allow 4–8 Wochen
  7. Register in MaStR and have a smart meter installed
  8. Commissioning + acceptance report

Note on grid operators: The table above shows common grid operators – it is not exhaustive. The grid operator actually responsible depends solely on the postcode . Find it using the postcode search: solar.red/netzbetreiber

How to submit the applications

1. Feed-in application to the grid operator

  1. Find the grid operator: Postcode search at solar.red/netzbetreiber
  2. Online portal of the grid operator (legally required since Jan. 2025)
  3. Complete the form: location, planned kWp capacity, feed-in type
  4. Wait for approval – 4 Wochen deadline (up to 30 kWp); automatically approved if there is no response after 1 month
  5. Tip: The installer often handles the registration – ask when requesting a quote

2. MaStR registration (Marktstammdatenregister)

  1. Portal: marktstammdatenregister.de
  2. Deadline: within 1 month after commissioning
  3. Required: system capacity (kWp), installation date, site postcode
  4. Tip: Many installers also take care of the MaStR – clarify this in the quote

3. LEKA MV – balcony solar grant (tenants only)

  1. Portal: leka-mv.de → Förderprogramme
  2. Apply: Before purchasing the plug-in solar device – purchase before approval leads to exclusion
  3. Grant: up to 500 € per residential unit, only for tenants with their main residence in MV
  4. Owners: Allocation exhausted, applying is currently not worthwhile

4. KfW 270 (federal level)

  1. Via your bank apply
  2. Portal: kfw.de/270
  3. Submit the application before placing the order