Solar installation – Berlin

Legal basis

  • EEG 2023 – feed-in tariff and funding (federal level)
  • Solarspitzengesetz – smart meter and control unit required for new systems from 7 kWp (since 25.02.2025); without a control unit, the grid operator permanently limits feed-in to 60 % of installed capacity
  • Berliner Solargesetz (SolarG Bln) – solar obligation for new buildings and roof renovations (since 01.01.2023)
  • Masterplan SolarCity Berlin – policy framework for climate neutrality by 2045

Solar obligation in Berlin

Since 01.01.2023 Berlin has had a statutory solar obligation.

FeatureRule
Applies toBuildings from 50 m² usable area – new buildings and existing buildings undergoing substantial roof conversion (renewal of the entire roof covering or at least the roof cladding)
Minimum capacity for new buildings≥30 % of gross roof area
Minimum capacity for roof renovation≥30 % of net roof area
Legal basisBerliner Solargesetz (SolarG Bln)
ExemptionsListed-building protection, north-facing orientation, shading, technically/economically unfeasible
FinesUp to 50.000 € – amount set in individual cases by the responsible Bezirksamt according to severity and intent
Important for 2026: For many existing buildings, statutory transitional periods expire in summer 2026. Anyone who has so far benefited from a transitional rule should act now to avoid fines.
Note on listed-building protection: Berlin has an above-average share of listed buildings (older buildings, Mietskasernen, protected ensembles). The exemption often applies here – but SolarPLUS specifically funds Denkmalschutz-PV by up to 65 % of the costs (see funding).

Official obligations

StepRequirementThreshold
1Register with Stromnetz Berlin (feed-in agreement)all systems
2Register in the Marktstammdatenregister (MaStR)all systems
3Install smart meter + control unitmandatory installation from 7 kWp; voluntary for 2–7 kWp, otherwise 60 % feed-in limitation
4Submit SolarPLUS funding application (IBB)before installation – otherwise no grant
5Finanzamt – annual returnfrom >30 kWp

Planning permission: generally not required for rooftop systems. Exceptions: listed-building protection (consultation with Denkmalschutzbehörde Berlin required), ground-mounted systems.

Business registration: not required for private individuals.

Insurance: extend residential buildings insurance (~50–150 €/year).


Berlin grid operator

FeatureDetails
Grid operatorStromnetz Berlin GmbH
Websitestromnetz.berlin
Grid connection costsapprox. 500–2.000 € (depending on capacity + meter cabinet adjustment)
Processing time4–8 W weeks (statutory deadline: 4 W weeks for systems up to 30 kWp)
Automatic approvalYes – if there is no response after 1 month, the system is deemed approved
From 30 kWpGrid compatibility assessment required
Grid connection funding: In addition to SolarPLUS S, a meter cabinet flat rate of 750 € has been available since 01.02.2026 (from 1.160 € gross costs for meter cabinet adjustment) – apply before installation.

Taxes & VAT

  • 0 % VAT on the purchase and installation of PV systems up to 30 kWp on residential buildings (since 01.01.2023)
  • Above >30 kWp: annual return to the Finanzamt required
  • Small business scheme: applicable to feed-in tariff

Costs

Installation costs in Berlin are slightly above the national average due to higher labour costs and a shortage of tradespeople.

System sizeCost/kWp (Berlin)Total costs (without storage)
3–5 kWp1.300–1.700 €5.900–8.500 €
5–10 kWp1.250–1.550 €8.000–14.500 €
10–15 kWp1.200–1.400 €14.000–21.000 €

Storage: 700–900 €/kWh (before SolarPLUS funding)

Operating costs: 1,5–2 % of the investment amount/year (~130–400 €)

After deducting SolarPLUS the payback period can be shortened by 1–3 Jahre – applying for funding is almost always worthwhile.

EEG feed-in tariff (Q2/Q3 2026)

Uniform nationwide – applies unchanged in Berlin.

System sizePartial feed-inFull feed-in
up to 10 kWp7,78 ct/kWh12,34 ct/kWh
10–40 kWp6,73 ct/kWh10,35 ct/kWh
40–100 kWp5,50 ct/kWh10,35 ct/kWh

Valid: 01.02.2026 – 31.07.2026 | From 01.08.2026, reduction of 1 % (six-monthly reduction under § 49 EEG 2023) | Funding period: 20 Jahre


Economic viability

Without storageWith storage
Payback period (without funding)9–12 Jahre12–16 Jahre
Payback period (with SolarPLUS)8–11 Jahre10–14 Jahre

Recommended system size for a detached house in Berlin: 8–10 kWp


Funding in Berlin – SolarPLUS

The central Berlin funding programme for PV systems, delivered by IBB Business Team GmbH within the framework of the Masterplan SolarCity. Relaunch: 08.01.2026 with a budget of 13 million euros, awarded on a first-come, first-served basis – funds may be exhausted early in the year.

Important: Submit the application before installation – retrospective funding is excluded.

Application: ibb-business-team.de/solarplus

SolarPLUS S – PV system with storage (detached houses)

New since 01.02.2026: The former separate storage funding scheme “EnergiespeicherPLUS” (300 €/kWh) has been replaced by a purely capacity-based flat rate – 250 €/kWp (rounded down). A battery storage system is a requirement for funding, but its size no longer affects the grant amount.

System sizeGrant (flat rate)
2–2,99 kWp500 €
3–3,99 kWp750 €
4–4,99 kWp1.000 €
5–5,99 kWp1.250 €
8–8,99 kWp2.000 €
10–10,99 kWp2.500 €
from 19 kWp4.750 €

In addition: 750 € flat rate for meter cabinet/house electrical system adjustments (from 1.160 € gross costs).

Plug-in solar / balcony power systems – no further funding

Direct SolarPLUS funding for plug-in solar devices (former Module E) was discontinued on 31.03.2025 and has been completely removed from the reformed programme since 08.01.2026 – balcony power systems are now considered economically viable even without a grant. Nationwide benefits (0 % VAT) remain in place.

Special systems (listed-building protection, façade, green roof)

MeasureFunding rateMaximum grant
Denkmalschutz-PVup to 65 % of costs5.000–30.000 €
Façade PVup to 65 % of costs5.000–30.000 €

House electrical system (larger grid connection/metering point measures)

Target groupFunding rateMaximum grant
Private individuals30 %10.000 €
WEGs / companies50 %15.000 €
For smaller meter cabinet adjustments under SolarPLUS S, the new 750-euro flat rate applies instead (see above) – clarify which module applies before submitting the application.

Compatibility

SolarPLUS can be combined with: EEG feed-in tariff, KfW 270 (loan), BAFA BEG EM (storage grant at federal level).

Businesses: Small: 50 %, medium: 40 %, large: 30 % funding rate.


Listed-building protection in Berlin

Berlin has one of the highest proportions of protected heritage in Germany. Special features:

  • Responsible authority: Untere Denkmalschutzbehörde of the relevant Bezirksamt (12 districts)
  • Coordination required: before applying to Stromnetz Berlin
  • Not automatically excluded: Heritage-compatible solutions, such as reversible rooftop systems and façade PV, are often approved
  • SolarPLUS heritage protection module: up to 65 % funding – explicitly designed for these cases
  • Feasibility study: SolarPLUS funds assessments at 45–65 % of costs (up to 15.000 €) – useful before investing

Installation steps in Berlin

  1. Check the roof (orientation, structural integrity) – for listed buildings: contact the Bezirksamt in advance; for existing buildings with an expiring transitional period (summer 2026), act promptly
  2. Submit SolarPLUS funding application (IBB) – before commissioning the installer
  3. Commission a certified specialist contractor (master crafts business, BSW member)
  4. Register with Stromnetz Berlin – allow 4–8 W weeks' lead time
  5. Register in the Marktstammdatenregister (MaStR)
  6. Have a smart meter / control unit installed by the metering point operator
  7. Commissioning + acceptance report
  8. Tax office (from >30 kWp), adjust insurance

Grid operator note: Berlin has only one electricity distribution network operator (Stromnetz Berlin GmbH), so this information is complete. In other federal states, however, the grid operator varies by postcode. Always check using a postcode search: solar.red/netzbetreiber

How to submit the applications

1. Feed-in application to the grid operator (Stromnetz Berlin)

  1. Portal: stromnetz.berlin → section “Feed-in operators / Renewable Energy”
  2. Complete the form: location, planned capacity in kWp, feed-in type (partial or full feed-in)
  3. Wait for approval – statutory deadline: 4 Wochen (up to 30 kWp); if there is no response after 1 month, the system is deemed approved
  4. Tip: The installer often handles the registration themselves – ask when requesting a quote

2. MaStR registration (Marktstammdatenregister)

  1. Portal: marktstammdatenregister.de (Bundesnetzagentur)
  2. Deadline: within 1 month of commissioning (legal requirement)
  3. Required: system capacity (kWp), installation date, site postcode
  4. Tip: Many installers also complete the MaStR entry – clarify this in the quote

3. SolarPLUS funding application (Berlin)

Must be submitted before installation – retrospective funding is excluded.
  1. Portal: ibb-business-team.de/solarplus
  2. Register and complete the form: system size (kWp), battery storage (mandatory for SolarPLUS S), building type
  3. Wait for the funding approval notice – only then appoint an installer
  4. After installation: Submit evidence (invoice, commissioning report)
  5. Advice: IBB Business Team – 030 2125-4747